冷再生施工各方面的準備工作
來源:http://ispycorp.com/ 日期:2022-08-24 發布人:
不管什么施工都建議是在之前做好相應的準備工作,一方面是為了更好的去提高工作質量加快工作進度,二來是為了保障人員的。下面冷再生機租賃廠家講講冷再生施工各方面的準備工作。
No matter what construction, it is recommended to make corresponding preparations before construction. On the one hand, it is to better improve the work quality and speed up the work progress, and on the other hand, it is to ensure the safety of personnel. Next, the rental manufacturer of the cold regeneration machine will talk about the preparation work in all aspects of the cold regeneration construction.
場地準備
Site preparation
(1)直接填筑的路基基底,施工前必需經過檢查簽證;需求停止地基處置的基底必需完成各項處置,并滿足地基處置的請求。
(1) The subgrade base directly filled must be inspected and signed before construction; The foundation that needs to stop foundation treatment must complete various treatments and meet the requirements of foundation treatment.
(2)場地應該保證足夠的平整度,滿足設備、人員進場請求。
(2) The site shall ensure sufficient flatness to meet the mobilization requirements of equipment and personnel.
(3)做好場地的暫時排水和防雨措施。依照施工運量和施工機械的大荷載建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. The construction access road shall be built according to the large load of construction traffic and construction machinery.
技術準備
Technical preparation
做好相關人員的技術培訓和技術交底工作,使參與施工的全體人員充沛認識高速鐵路路基填筑的關鍵技術、質量控制要點。
The technical training and technical disclosure of relevant personnel shall be carried out to make all personnel involved in the construction fully understand the key technologies and quality control points of high-speed railway subgrade filling.


平安控制要點
Safety control points
1、施工區域應設警示標志,嚴禁非工作人員出入。
1. Warning signs shall be set in the construction area, and non staff are strictly prohibited from entering and leaving.
2、施工中應對機械設備停止定期檢查、養護、維修。
2. Regular inspection, maintenance and repair of mechanical equipment shall be stopped during construction.
3、為保證施工平安,現場應有專人統一指揮,并設一名專職平安員擔任現場的平安工作,堅持班行進行平安教育制度。
3. In order to ensure the safety of construction, the site shall be under the unified command of a special person, and a full-time safety officer shall be appointed to take charge of the safety work on the site, and the safety education system shall be adhered to.
4、改進土施工中,現場設專人指揮、調度,肯定適宜的機械車輛走行道路,并設立明顯標志,避免互相干擾碰撞,機械作業要留有平安間隔。制定作業程序和運轉道路,確保諧和施工,平安消費。
4. During the construction of improved soil, special personnel shall be assigned to direct and dispatch the construction site to confirm the appropriate road for mechanical vehicles and set up obvious signs to avoid mutual interference and collision. Safe intervals shall be reserved for mechanical operations. Formulate operation procedures and operation roads to ensure harmonious construction and safe consumption.
冷再生施工各方面的準備工作的相關內容就講解到這里了,您對此有什么疑問可關注我們網站http://ispycorp.com直接來咨詢。
That's all about the preparations for cold recycling construction. If you have any questions, please follow our website http://ispycorp.com Come directly to consult.
下一篇:水泥冷現場再生施工也有其注意事項 上一篇:沖擊碾壓路機道路施工中有幾點不同注意
閱讀/ Recommended reading
- 冷在生機租賃:路面養護措施——冷再生 2025-09-18
- 冷再生機租賃:冷再生技術助推綠色發展 2025-09-17
- 冷再生機租賃:經研究和測試驗證的冷再生道路使用壽命超長 2025-09-16
- 冷在生機租賃:就地冷再生攤鋪工藝的施工要求 2025-09-08
冷再生機租賃:舊瀝青路面再生技術圖文詳解
[2025-09-19]
現場冷再生法是用大功率路面銑刨拌合機將路面混合料在原路面上就地銑刨、翻挖、破碎,再加入穩定劑、水泥、水(或加入乳化瀝青)和骨料同時就地拌合,用路拌機原地拌合,碾壓成型。現...